DN150 HARD SUCTION 4 POINT BOOSTER RISER – BI Connection
FFS-ASSY-RS150
FFS-150MM4PTBA
Nominate Storz (150RG x 125 Storz or 150RG x 150 Storz)
Please nominate connections, LH or RH entry & either butterfly or gate valves required to suit relevant authority requirements.
- Booster assemblies are manufactured to conform to the requirement of AS2419 & to relevant local authorities. All components comply to the requirements of AS2419.
- Any fabricated components are Hot Dipped Galvanised as required in AS2419.
- All components will withstand pressure testing up to 2100kpa.
- All booster units can be supplied as individual components or fully/ part assembled.
Specification Sheets
Description
To Allow Fire Brigade Appliances to Draw Water From a Tank and to:
- Boost Into a Hydrant or Sprinkler Systems By-Passing Pumps
- Draw Water From Tank to Another Fire Brigade Appliance